Current existing pier.
- The design must:
- Location
- Be within specified perimeters in the Chapel water area off of Sandy Hook coast
- Environment for Use
- Be able to withstand rain, wave currents, and other natural weather patterns
- Retain stability for all four seasons (Summer, Fall, Winter, Spring)
- Condition of Solution
- Be spatially scaled
- Reuse/Recycle existing piers and/or failed bulkheads
- Be made with environmental products/eco-friendly materials or ideas (docks)
- Retain land/soil and protect against erosion (bulkhead)
- Be constructed out of eco-friendly products and ideas (bulkhead)
- Follow all building/zoning requirements
- Be economically efficient
- User/Consumer
- Be safe for all boats and people, with proper piling and anchoring requirements
- Allow for various sizes of boats to tether safely to the docks

Good Job!
ReplyDelete