12.21.2010

Log Nine: 12/21/10

My press release was due today, and it is up and running on my blog just in case it needs to be accessed in the future. My current plan is to continue working my production work, including my material take off lists, which have yet to be updated since the new proposed design. I also need to alter my bulkhead plans after consulting with a bulkhead specialist last Wednesday. I should have this alteration completed by December 23, 2010.

Press Release: 12/21/10

Systems Engineering II: Green Marina, a Teenage Not-So-Wasteland
Presentation Announcement

The Green Marina project simulates the steps that a team of engineers must take in order to design a real plot of land for a marina, and includes details such as water depths, topography, existing bulkheads (See Figure 1), and all of the other specifics that go into the design process. The official presentation for this project will take place on January 18, 2011 at the Marine Academy of Science and Technology (MAST).

Figure 1 (above): A view of the 
proposed area from the south side.
A Look Inside
Maddison Roy, a senior at the MAST, is taking on the role of a structural engineer for the marina, specializing in dock and bulkhead construction (see Figure 2). To achieve full realistic potential, she has obtained vital information through extensive research of how docks in the area are made, and how bulkheads maintain their strength and durability. She had to complete detailed, dimensioned AutoCAD drawings of cross sections, elevations, and 3D views, just as a typical engineer would.
Figure 2 (above): An autoCAD drawing 
of Ms. Roy’s proposed dock system.
The Goal
The effort of the team as a whole is to design and create a model of an environmentally friendly “green marina.” This marina must provide the public with recreational water access and enable each group member to complete tasks pertaining to their specialty. Ultimately, the marina should be a functional and cohesive solution.

Meet the Team
The proposed area for this marina is the Fort Hancock Chapel area (see Figure 3). The entire site is basically split up into two parts: civil and structural, each with a head engineer (Ann Marie Carton and Christine Conlon, respectively). Specialty jobs for the civil side include Landscaping (Anna Bennett), Electrical/Alternate Energy (Alexandria Nash), Stormwater/Excess Water (Michael Ray), and Fueling (Michael Rubens). On the flip side, structural specialties include Dock and Bulkhead (Maddison Roy), Ramp (Hiliary O’Neill), Breakwater (Nicholas Pagano), and Fueling (Erika Thompson). Each student is allowed to access mentors from across the world to aid him or her in the development of the specific section. The students are also able to use more than one mentor, which allows for a variety of opinions to be processed.
Figure 3 (above): Fort Hancock Chapel area on Sandy Hook.

The Process
The design process plays a major role in the entire “Green Marina” project. A student must thoroughly research his or her section, including any and all background information that they can find. They brainstorm to come up with unique solutions, and ultimately develop a multitude of alternate solutions, from which one final product will emerge. Developmental work must be completed to show that a student has properly researched his or her topic and can properly execute their ideas in conceptual or exact drawings. A group model is also created.
STEMM
The Science, Technology, Engineering, Manufacturing and Math (STEMM) report is a major written and conceptual form of assessment that is critical to the development of the green marina project. Many (if not all) of the students have used math, science, and technology to come up with exact calculations and data that they will need to continue work. The use of engineering and manufacturing has also been huge, since certain students are not completely designing and constructing their individual assignments may be using preordered pieces, such as fuel management and dock floats. With this assignment in mind, students are reminded to use every source available to them, and to be as precise and realistic as possible.
Figure 4: Maddison Roy’s blog. 
This post relates to the first 
presentation that was held in November.
Presentation Day
                The upcoming presentation is scheduled for January 18, 2011. It will include background information of the project itself, as well as any major progress made since the last presentation that was given in the first marking period of school. The individual design brief will be shown in every presentation, which includes the main idea of the project as well as how the final product will ultimately function. You can see a sample of this presentation in Figure 4. The final piece of the presentation has to do with individual construction and production work.

A Look Back
The overall desired product is a set of detailed drawings for a marina that is both economically and environmentally efficient. These plans will take into account the environmental aspects of materials, space, plants, and more, creating a cohesive and productive area. Students have put in hours of research and work to achieve realistic standards for a project that could be considered tough even for a set of qualified engineers. They will have the opportunity of presenting their drawings and other research on January 18, 2011 at MAST. With so much hard work already put in, it is obvious that these seniors are getting the full engineer experience.

For more details about the Green Marina project in Sandy Hook, NJ, contact Maddison Roy or visit MAST at www.mast.mcvsd.org.

About the Marine Academy of Science and Technology
The Marine Academy of Science and Technology (MAST) is a co-ed four-year high school, grades 9-12; one of five career academies administered by the Monmouth County Vocational School District (see figure 5). The Marine Academy is fully accredited by the Middle States Association of Schools and Colleges and offers small classes with close personal attention. The Marine Academy was founded in 1981 as a part-time program, which has since grown to become a full-time diploma-granting program. The school's curriculum focuses on marine sciences and marine technology/engineering. The MAST program requires each student to participate in the Naval Junior Reserve Officer Training Corps (NJROTC) in lieu of Physical Education.

Figure 5: MAST is located on Sandy Hook, NJ.

MAST is located in the Fort Hancock Historic Area at the tip of Sandy Hook, New Jersey. The school campus is located adjacent to the Sandy Hook Lighthouse, the oldest working lighthouse in the country, in thirteen newly renovated buildings, within walking distance of several beaches. The "Blue Sea" is a 65-foot research vessel owned and operated by the Marine Academy and berthed at the U.S. Coast Guard Station, Sandy Hook. The vessel is used in all facets of the program.
###

12.17.2010

Log Eight: 12/17/10

I am almost finished with my press release, with only one or two more paragraphs to be completed. I am planning to begin production work on Tuesday, December 21st.

12.14.2010

Log Seven: 12/14/10

Today I continued to work on my Press Release, which should be done over next weekend. I am also waiting to rework my materials lists due to the changes in design.

12.09.2010

Log Six: 12/09/10

Yesterday, I was able to complete my 3D isometric view for my bulkhead. I still have a bit of tweaking to do, but otherwise my drawings should be ready for evaluation. Because the design of the layout for the docks has been altered since my materials lists were compiled, I will need to update both lists. This should be done by Wednesday of next week, assuming that I can use a copy of the plans to do my calculations. I am currently working on my press release assignment, which is to be completed by December 21st for evaluation.

12.07.2010

Log Five: 12/07/10

I have finished all of my developmental work 2D drawings and my isometric dock drawing. This leaves only my isometric bulkhead drawing, which is currently being worked on. It should be combined with the isometric dock drawing within a few days. I hope to begin working on the press release assignment shortly after, while also working with Christine to finalize the structure of the extended platform that attaches the docks to the land.

12.03.2010

Log Four: 12/03/10

Although I have not been in school due to an illness (yesterday and today), I continued to work on the isometric drawing for my bulkhead structure. This is expected to be completed by mid-next week. I will hopefully begin working on the press release assignment after this is completed.

12.01.2010

Log Three: 12/01/10

I am slightly behind schedule, and have just finished up all but my 3D drawing for the bulkhead for my developmental work. I plan to finish this as soon as possible so that I may begin working on how the new octagonal shape will be configured (it is taking the place of the circle deck area.) All of the docks are also being redone, so I will have to recount material information and add an extra floating dock for the side-tie areas near the ramp.

11.24.2010

Log Two: 11/24/10

I am currently continuing on my developmental work, mainly re-drawing and reconfiguring materials lists. I have been using CAD to draw the cross sectional and elevation views, and will be using Google sketch-up to complete the 3D view of the bulkhead and circular deck area. I will be working on this throughout the break and plan to begin more in-depth production work by the end of the month.

11.20.2010

Calendar

November 2010 Schedule
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22
Dev
Work
23
Dev
Work
24
Dev
Work
-Log-
25
Break
(Dev Work)
26
Break
(Dev Work)

27
Break
(Dev Work)
28
Break
(Dev Work)
29
Production
Work
(Drawings)
30
Production
Work
(Drawings)





 
December 2010 Schedule
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday



1
Production
Work
(Drawings)
2
Production
Work
(Drawings)
3
Production
Work
(Drawings)
4

5

6
Production
Work
(Drawings)
7
Production
Work
(Drawings)
8
Production
Work
(Drawings)
9
Production
Work
(Drawings)
10
Production
Work
(Drawings)
11

12

13
Press Release
14
Press Release
15
Press Release
16
Press Release
17
Press Release
18

19
20
Press
Release
21
Press Release
Due!
22
Production
Work
(Drawings)
23
Production
Work
(Drawings)
24
Break?
25
Break
26
Break

27
Break

28
Break
29
Break
30
Break
31
Break



January 2011 Schedule
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday






1
Break 
2
Break Ends
3
Production
Work
(Drawings)
4
Production
Work
(Drawings)
5
Production
Work
(Drawings)
6
Production
Work
(Drawings)
7
Production
Work
(Drawings)
8
9

10

11
Log/Calendar
Due
12

13

14
Mentor
Contacts/FPU Outline due
15

16

17

18
Production
Work due/
FPU
19
FPU
20
FPU
21
MIDTERM:  MATH/SCI
ANALYSIS
22

23/30

24/31

25

26

27

28

29

11.17.2010

Log One: 11/17/10

I am currently working on my developmental work. Within the past few days I have completed both materials lists for the docks and bulkhead, and will be creating a detailed schedule in the future. I also need to complete an isometric bulkhead, and take different views for my cross section and elevation views. This should be completed by the end of next week (the week of Thanksgiving.)

11.03.2010

Developmental Work

Developmental Work

Elevation Views:



Cross Sectional Views



Isometric View (Dock)



Isometric View (Bulkhead)




Materials Takeoff List (Dock)



ITEM NAME/USE OF PIECE
NO. OF PIECES

UNIT
LENGTH IN PLACE

SIZE

LENGTH
NO. PER LENGTH

QUANTITY
1. Dock Floats
1722
PC
4’
2x4
4’
1
1722
2. Pilings (far)
132
PC
45’
1x1
45’
1
132
3. Pilings (close)
169
PC
40’
1x1
40’
1
169
4. Support Pilings
309
PC
20’
1x1
20’
1
309
5. Hycrete Top
3909
RL
RL
RL
RL
-
-
6. Plastic Lumber
3475
PC
10’
2x6
10’
1
3475
7. Plastic Lumber
320
PC
12’
2x6
12’
1
320
8. Plastic Lumber
114
PC
16’
2x6
16’
1
114
9. Siding/Stringers (short)
177
PC
10’
2x6
10’
1
177
10. Siding/Stringers (long)
30
PC
RL
2x6
16’
-
-
11.Braces
1236
PC
9.5’
2x6
10’
1
1236
12. Hardware
2472
PC
RL
¾” DIA
24”
1
2472


Materials Take-off List (Bulkhead)

ITEM NAME/USE OF PIECE
NO. OF PIECES

UNIT
LENGTH IN PLACE

SIZE

LENGTH
NO. PER LENGTH

QUANTITY
1. Steel Bars
81
PC
19’
1x1
40’
2
41
2. Steel Crossbar
81
PC
RL
1x1
60’
10
9
3. Concrete Pilings
81
PC
20’
2x2
20’
1
81
4. Hicrete
81
PC
5’
5x2
5’
1
81
5. Hicrete Arc
81
PC
5’
5x1
5’
1
81