2.11.2011
Log 5: 2/11/11
Once again, information for the bulkhead has changed. The height is still being calculated. Also, the height of the support pilings for the docks will be altered. Because of this setback, I am reworking my drawings. However, the solution otherwise is essentially the same.
Quick Views:
MP 3 Progress Logs
2.09.2011
Log 4: 2/09/11
I have slightly altered my drawings, based on new information that has been given to me by Christine and Ann Marie.
I will soon begin to prepare information for making my model.
Also, my exhibit poster is going well, and should be completed very soon.
I will soon begin to prepare information for making my model.
Also, my exhibit poster is going well, and should be completed very soon.
Quick Views:
MP 3 Progress Logs
2.07.2011
Log 3: 2/07/11
I continued work on my FPU outline, to the best of my ability. I was able to take a look at the testing results assignment, but have yet to complete my final solution. I hope to finish my drawings by the end of the week, or as soon as Christine and Ann Marie update the bulkhead depth.
Quick Views:
MP 3 Progress Logs
Subscribe to:
Posts (Atom)