4.05.2011

Log 23: 4/05/11

Logs were due yesterday along with a calendar and participation. The marking period is ending, and I am still struggling to complete my second model. However, I am making some headway with the structure and plan to have both models brought in by the end of the week at latest.

My dock model is completed on my end, but lights need to be attached and tested. My bulkhead model is too top heavy, and does not want to stay together. I need to find a way to secure it in the "ground," which will most likely be a plastic box or something of the like, while still being able to show off the structure. If possible, I would also like to attach the dock model to the bulkhead model, but do not expect to be able to since I am having so much trouble.

4.04.2011

Log 22: 4/4/11

Logs are due today! So I thought I'd post something. We finished up FPUs today with RVD, and I spoke to Mr. Cuttrell and Ms. Green about what to do about my models. They will both be complete and brought in BY Friday, hopefully before.

Otherwise, Happy end of marking period 3, and hello marking period 4! [:

3.31.2011

Log 21: 3/31/11

I was not in class yesterday, so I ended up handing it in today! I was the only one though... so... yep.

I'm really not smart. My stupid model isn't working (not the first one, the second one...) and I keep on forgetting to bring in the other one. BUT! Otherwise I'm donedonedone with my senior project, which rocks.

Won't be here tomorrow, so happy Weekend!

3.29.2011

Log 20: 3/29/11

So I handed in my testing procedures, thankfully my mentors got back to me!

FPUs also started today. No one was really prepared, so I ended up being one of the first ones. No biggie though, I knew what I was talking about. [:


MODEL. MODEL MODEL MODEL. I'm really sorry, I really need to bring it in. It really would have helped my grade for my FPU...

Self Design/Evaluation due tomorrow!

3.28.2011

Formal Progress Update 3: 3/29/11


FPU3: Problem Background

A failed bulkhead from the site.


FPU3: Design Brief


Design and create a model for the docks and bulkhead of a “Green Marina” that will allow commercial, recreational, and research boats to dock safely. The marina is to be designed on a sectioned off piece of Sandy Hook’s western coast (above).

FPU3: Individual Specifications

Current existing pier.

Specifications:
  • The design must:
    • Location
      • Be within specified perimeters in the Chapel water area off of Sandy Hook coast
    • Environment for Use
      • Be able to withstand rain, wave currents, and other natural weather patterns
      • Retain stability for all four seasons (Summer, Fall, Winter, Spring)
    • Condition of Solution
      • Be spatially scaled
      • Reuse/Recycle existing piers and/or failed bulkheads
      • Be made with environmental products/eco-friendly materials or ideas (docks)
      • Retain land/soil and protect against erosion (bulkhead)
      • Be constructed out of eco-friendly products and ideas (bulkhead)
      • Follow all building/zoning requirements
      • Be economically efficient
    • User/Consumer
      • Be safe for all boats and people, with proper piling and anchoring requirements
      • Allow for various sizes of boats to tether safely to the docks

FPU3: Individual Limitations

View of the failed timber bulkhead at high tide.

Limitations:
  • Size Restrictions
    • The design must not alter from laws or codes regarding placing, length, or construction of docks and bulkheads
    • Must meet regulations
  • Material Restrictions
    •  Environmentally friendly, yet efficient
    • Cement, Vinyl, Recycled wood (types of wood, patterns,etc)
  • Other Restrictions
    • Bulkheads cannot severely alter ocean patterns in a negative way

FPU3: Testing Procedures and Results

Final solutions of the bulkhead and dock systems. 
I. Testing procedures
1.     Review all plans with the Green Marina team. The design of the docks and bulkheads for the Green Marina should meet and exceed all client-based needs. All clients and mentors should overview the design and speak to the team about any flaws within the layout or setup. All discrepancies must be documented as part of the Final Evaluation and be eliminated.
2.     A well-based group of plausible clients (mentors, field specialists) should be given a survey in which they give feedback on the structural design and environmental aspect of the Green Marina’s dock and bulkhead systems. This is the primary stage of testing.
3.     After the surveys have been taken by the mentors and assessed, any major discrepancies will be eliminated or fixed.
4.     Further assessment will be done and documented as part of the Final Solution.

FPU3: Conclusion



Questions?

3.25.2011

Log 19: 3/25/11

It's around 2:00 pm in Systems class. I've been talking to Ms. Green, and she said it was alright that I didn't have testing, especially since no one else did. None of us think ahead! So... hopefully I will have that soon, because the marking period ends on April 4th or 5th or something, which is a little over a week.

I'm also stupid, and didn't bring in my model. Should be happening early next week.

3.23.2011

Log 18: 3/23/11

So, about testing... none of my mentors have gotten back. However, there are certain parts of my testing results that I can work on, such as the description of the final solution, who is involved in testing, and how exactly I am testing.

My model is finally coming together! I'll have it in on Monday. I still have to do my other one though. Hopefully it will work better than the first.

3.22.2011

Log 17: 3/22/11

Final Solution was due yesterday. Unfortunately, my model is not working with me. I will try to complete it ASAP, and will then complete my bulkhead model.

Mentor Contacts are also due today, and I handed them in to Ms. Green a little while after class, since I stayed late for play practice... [:

Still nothing for testing. ]: Oh dear.

3.18.2011

Log 16: 3/18/11

Seriously! I can't believe my stupid model -- it still will not work, even when I switched materials. Something is going to have to change, I just don't know what. I'll update when I make some progress.

Testing is due in a week, but no word from my mentors. Hopefully I will get an update on that as well!

3.15.2011

Log 15: 3/15/11

I am trying to complete my model, but am having an extremely hard time. Every time I attempt to to glue the cross braces together, or even to the frame, they break or warp. Its kind of really terrible. I'm trying to find a new material (preferably some sort of wood or plastic) to replace the styrofoam.

Also! I sent out my surveys and information packets to my mentors over email. They will hopefully fax it back soon! I also finalized my exhibit poster and my FPU outline. So just model, testing, and self evaluation to go. [: So close!

3.11.2011

Log 14: 3/11/11

Visited Hobbymasters with Anna Bennett on Wednesday! Went very well, I was able to speak with a store employee who helped aid me in my material choices. He suggested styrofoam for most pieces, along with some plastic or wood pieces. Very helpful. [:

3.09.2011

Log 13: 3/09/11

I have finished painting my model pieces (well, what I have anyway...) and plan to start putting it together very soon. However, Ms. Green recently told me that I need TWO models (one for bulkhead, one for the dock), so I am planning on going to Hobbymasters after school today with Anna.

3.06.2011

Log 12: 3/06/11

Although it's a Sunday, I thought I'd update.

I began work on my FS Info for my mentors. It's mainly a composition of my finished solution renderings, material schedules, and information about the types of materials being used. This should be completed by the end of the week, and then each mentor (John Wanninger, Katherine Mobley, Mr. Danko, Bill Bates) will be asked to take the survey.

3.04.2011

Log 11: 3/04/11

Started my model! However, I am missing piling and decking materials... I'll probably ask Mr. Cuttrell to help me out?

I also still have a lot to do. I plan on working on my Final Solution packet for my mentors this weekend.

3.02.2011

Log 10: 3/02/11

Have my calendar up! [:

Also obtained my supplies for my model. I plan on working on it the next few weeks. I have also reworked my survey, and will create an information packet to distribute to my mentors.

Happy hump day!

Calendar: February - April [MP3]

February 2011 Schedule
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday


1

2

3

4

5
6
7

8

9

10

11

12
13
14

15

16

17

18

19
20
21

22

23

24

25

26
27
28







March 2011 Schedule
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday


1

2

3

4

5
6
7

8

9

10

11

12
13
14

15

16

17

18

19
20
21
Final Solution Due
22
Mentor Contacts Due
23

24

25
Testing Results Due
26
27
28

29
Exhibit Poster/FPU Outline Due
30
Self Design/Eval
Due
31



April 2011 Schedule
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday





1
2
3
MP 3 ends
4
Participation/
Logs/
Calendar Due
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

29
30

2.25.2011

Log 9: 2/25/11

Almost forgot to post!

It's gotten pretty slow recently. I need to go out to get supplies for my model after calculating what I need. I expect to begin work by March 4, but no true indication.

I'm working on my calendar, but its at school, so I will post it on Moday.
Happy weekend!

2.22.2011

Log 8: 2/22/11

Discussed how the final solution would be printed (eg with color? the sizes?) with Christine. She's not sure yet, so I'll hold off until we get closer to plotting.

2.17.2011

Log 7: 2/17/11

Ran a new idea past Christine: if the docks are 13 ft up, why not create stairs at the base to lower them?
Just a thought, I have no idea if they'll want to do it.

2.14.2011

Log 6: 2/14/11

My drawings are fully fixed, and the information for the models is finally accurate. Materials will be bought, and construction will begin as soon as possible, either in or out of school.

2.11.2011

Log 5: 2/11/11

Once again, information for the bulkhead has changed. The height is still being calculated. Also, the height of the support pilings for the docks will be altered. Because of this setback, I am reworking my drawings. However, the solution otherwise is essentially the same.

2.09.2011

Log 4: 2/09/11

I have slightly altered my drawings, based on new information that has been given to me by Christine and Ann Marie.

I will soon begin to prepare information for making my model.

Also, my exhibit poster is going well, and should be completed very soon.

2.07.2011

Log 3: 2/07/11

I continued work on my FPU outline, to the best of my ability. I was able to take a look at the testing results assignment, but have yet to complete my final solution. I hope to finish my drawings by the end of the week, or as soon as Christine and Ann Marie update the bulkhead depth.

2.03.2011

Log 2: 2/03/11

I began working on my FPU outline and exhibit poster, to the best of my ability.


I am also waiting on Ann Marie and Christine to finalize the height of the bulkhead.

2.01.2011

Log 1: 02/01/11

Today I finalized my drawings to the best of my ability. I also took a look at my original testing procedures to see if they would be adequate for the testing to come. I plan on remodeling them by the end of the week.

1.21.2011

STEMM Report

STEMM Report (Midterm)
Problem and Scenario 
The “Green Marina” project (see Figure 1) reaches out to a multitude of topics within the science, technology, engineering, manufacturing, and mathematic (STEMM) fields. Specifically, the dock and bulkhead systems are by far some of the most vital designs in a complete marina system. Sustainable docks are not always prominent due to natural wear throughout years of wave and weather action. Similarly, bulkhead construction is a detailed process, and if designed incorrectly could result in bulkhead failure within the first few years. Therefore, it is critical that a thorough solution be reviewed to ensure the most sustainable and environmentally-friendly products.

Design Solution: Dock
            The design solution for the dock system is separated into two parts: stationary and floating. Stationary dock systems have composite-concrete pilings and steel rebar running throughout. The decking is also made out of a composite material that will resemble wood. Floating docks will have prefabricated wooden frames that will be able to contain the floats holding up the dock. There will also be composite decking used to maintain a cohesive aesthetic. Figure 2 shows the final solution for the entire dock system.

Design Solution: Bulkhead
            The design solution for the bulkhead uses materials similar to those in the dock system. The bulkhead mainly uses composite-concrete with steel rebar because these materials hold up better than wood, and are more environmentally-friendly than using steel or concrete alone. There is also a steel tie-rod and anchor system. Figure 3 shows the final solution for the bulkhead system.


Innovation of Vital Systems
            In relation to Systems Engineering II, the final designs for the dock and bulkhead systems are innovations because they already exist in some form. These systems are major factors in the marina concept, with the dock allowing vessels to visit the marina and the bulkhead providing protection from wave action and retaining the land (see page 2, Figure 4). With further examination, these systems use fundamental engineering to complete the design, production, and construction process.

STEMM: Engineering
            The most obvious form of engineering involved is environmental engineering because of the conscious research. The “green” view on materials allows for efficient, sustainable designs. Construction engineering is also used in a conceptual way (see Figure 5). The actual dock and bulkhead systems will not be constructed, but the project calls for evaluation as if they were considered legitimate construction plans. This makes for a more realistic project.
            Another type of engineering used in the process is materials engineering, which can be viewed in Figure 6. The creation of new materials can often create stronger products as an end result. Material and environmental engineering work off each other because the materials have less of an impact on the environment due to research. However, regardless of the materials used, if the structure is not sound, then the entire system will eventually fail. Structural engineering is the key to a sound production plan, and plays the biggest role in the dock and bulkhead systems.



STEMM: Manufacturing
            Manufacturing is also critical in the production process. In order to know how the system will be constructed, the process must be thought through. In this case, there are two major types of manufacturing used in the stationary dock system, and three used in the bulkhead and floating dock systems. Mass production (see Figure 7, left) is used in the dock system in that there are repetitive pieces such as pilings, rebar, and decking that must be made for hundreds of feet of docks. The putting-out system is also used because processed work would be delegated to different levels of production. The floating dock system uses both of these types of manufacturing, as well as prefabrication because of the floats and their dock frames. This is identical to the bulkhead system, which uses prefabricated sheeting. The putting-out system and mass production manufacturing are also prominent.
            Not only is the type of manufacturing important, but also the categories of the design.  The two main categories for the systems are construction and steel production. Construction is the more critical of the two, because it deals with the infrastructure of the design for both the dock and bulkhead systems (see Figure 8). However, steel production is still very important because the stationary docks need a lot of steel, just as the bulkhead has steel running throughout.

STEMM: Science
Overall, two major marine biology concepts affect the systems. The gravitational pull of the moon has major affects on the tides, which contribute to the other important factor: degradation. Weather patterns like snow, rain, and high winds (see Figure 9) cause degradation to the top of the docks and bulkhead, while the salt water affects the bottom of the bulkhead and the under workings of the dock systems.

Stationary Docks and Gravity
            Science plays a major role in the production and construction of a dock and bulkhead system. Docks need to be stabilized by multiple means. Because of wave and weather patterns, steel braces must be in place. This prevents the dock from toppling over. Rebar must also be in place so that in between piling sets there is no stress or sag in the structure. Gravity is most likely to cause the most damage over a period of years, and so it is important to understand Newton’s laws as well as general physics to avoid simple errors (see Figure 10). An example for this concept is the idea of the dock not being supported with rebar. In this case, the dock could still function for a period of time, but it may not even last a full year before it collapses. Structural pieces are crucial because without them gravity will cause too much damage.

Floating Docks and Buoyancy
            Floating docks use an entirely new concept to remain structurally sound. Archimedes has a principle that states that an object, whether wholly or partially immersed in a fluid, is buoyed up by a force equal to the weight of the fluid displaced by the object. This concept is called buoyancy, and must be properly addressed in order to have a functioning structure (see Figures 11 & 20). The final solution for the floating docks involves lightweight floats, wood framing, and composite decking. If instead the composite decking was a thick slab of concrete, there would be a higher chance of lower buoyancy and therefore a failed system.

The Bulkhead and Pressure
            The bulkhead system has one major science concept, and that is pressure (see Figure 12). The bulkhead must be able to retain the land on one side, while still being able to withstand the waves, and, in many cases, the weather patterns. The pressure of the land is often immense, and will gradually increase as time goes on, because when a bulkhead is first put in the fill has not settled.  The tie-rod and anchor system are necessary to prevent failure because they hold up the bulkhead and allow the pressure to be displaced. If this system were not in place, the bulkhead would fail within weeks.    
           
STEMM: Technology
            The majority of the technology involved in dock and bulkhead construction relates to how individual pieces are made, and how the overall structures are built. The pilings for both systems are hammered in by a pile driver, which uses a loop system to secure the pilings in place while they are being pushed down into the sediment (see Figure 13, right). Also, the advancement of materials has improved greatly. Composite decking is more weather resistant than regular wood decking due to research on how wood reacts to inclement weather. Composite concrete is just as strong, if not stronger, than concrete because fibers in the mixture allow better hold.

Bulkhead Technology
            The tie-rod and anchor system in the bulkhead is a major technical component because it has been created through trial and error as well as research. It is evident in the progression of the final solution that research was the main factor in advancing technology (Figure 14). The bulkhead uses sheeting, which is mass-produced offsite and brought in pieces to be assembled in front of the whaler. The whaler is attached to the tie-rod and anchor system, the anchor being set back 12 feet. Trucks and construction vehicles are another portion of the bulkhead technology because they are used in transporting materials before and during construction.

Dock Technology
            Due to research and years of examples, new technologies and ways of building docks have surfaced. Steel processing and lightweight composite concrete enabled the final solution to be more advanced than solutions including dense concrete and other materials. AutoCAD (see Figure 15) is also an important technology because it allows early, conceptual drawings to become more precise and accurate.

STEMM: Math
            The final drawings focus on one major portion for the materials of the structures: the amount of materials that will actually be used. In order to have a correct materials list, certain computations must occur. The main formulas used are for the area and volume of an octagon, a rectangle, and a triangle.


Bulkhead Calculations
The main mathematical computations used for the bulkhead involve pressure and fill. To calculate pressure, the formula below is used (see Figure 17).
Pressure = Force/Area
Calculating pressure is necessary to ensure that the bulkhead can withstand the land for an extended period of time.
            Fill is also a necessary computation for the bulkhead system. To calculate fill, the volume formula for a triangle is used.
Volume = 1/2 (base x height x width)
            Fill must be calculated in order to understand the amount that must be requested once construction is complete.  However, extra should be calculated in because fill settles within a few months.
Stationary Dock Calculations
            The most important calculation for the stationary dock system is the maximum weight that the dock can support (see Figure 18). This takes into account tied-up vessels as well as people walking along the top of the docks. The computations for net force are as follows:
Forcenet = Force1 + Force2 + … + Forcen
            These calculations take into account all of the different forces coming from all directions in order to show whether the final solution will last for an extended period of time or fail under the weight.
            Another important math concept is toppling force, also known as torque. Torque is vital because it measures the tendency of a force to rotate an object about an axis (see Figure 19).
Torque = (displacement vector) x (Force vector)
            A measurement of torque will aid in viewing the effect of waves on the dock system. This evidence could be used to fix any possible weakness in support.


Floating Dock Calculations
            Floating docks also need to have net force assessed. However, there is one major contrast between net force for stationary docks and net force for floating docks. Floating docks require a separate calculation for buoyancy (see Figure 20). This calculation appears below.
Density of object         ____________weight_____________
density of fluid      =    weight - apparent immersed weight
            By including buoyancy in the final calculations, a safe floating dock system can be properly installed.

In Conclusion
            The dock and bulkhead designs are fundamental innovations typically involved in a “Green Marina” concept (see Figure 21). The structures require access to all parts of STEMM. Without structural, environmental, material, or construction engineering, there would be serious flaws in both systems. Manufacturing is also vital because mass production, prefabrication, and the putting-out system are critical to the production process. Engineering and manufacturing shape the materials list in the dock system, while the bulkhead system takes advantage of the processes by applying them to bracing and retaining techniques (see Figure 22).
            In addition, key technological advancements, such as pile drivers, autoCAD, and construction equipment are able to improve the sustainability and functionality of the pieces. Scientific concepts involving gravity, buoyancy, and pressure provide proof of sound design plans. Math equations for pressure, volume, net force, buoyancy, and torque are also excellent indicators of the project’s realistic nature.