The Bulkhead is composed of steel; if possible, they will also contain pieces of the old bulkheads. The existing pier will be taken out or incorporated into the final solution.
Matches all specifications and limitations.
Pilings are made of steel; coated with lacquer for safety measures against the elements.
All docks are stationary; made of concrete for durability.
Larger docking areas for large vessels on the northern end of the docks. Fueling Station(s) are on the southeast end of the area.
NOTE: This drawing was more closely drawn based on aesthetic features; at the time, only basic dock requirements were known. Please see updated individual specifications and limitations for berthing requirements.
Optional: Electricity and Freshwater for docks? (Discuss with Electrical Engineer and/or freshwater pump expert.)


