Showing posts with label Testing Procedures. Show all posts
Showing posts with label Testing Procedures. Show all posts

9.13.2010

Testing Procedures: Individual

View of southern part of area, looking southeast.


Design Expectations: The design of the Green Marina docks and bulkheads should satisfy all possible clients, customers, and team members in every element. The design should be overall aesthetically pleasing and environmentally friendly. The docking layout should follow all specifications and avoid all limitations. The Green Marina dock design should also allow for a large number of boats to travel to and from its docks, and the bulkhead should fulfill its requirement of protecting the coast line and minimizing wave action within the immediate perimeters of the docks. Environmental concerns, such as shore erosion and wave action, should be clearly addressed. Most of all, the Marina docks and bulkheads should be safe and follow all building and zoning requirements provided by Sandy Hook officials.


Testing procedures are as follows:


1. Review all plans with the Green Marina team. The design of the docks and bulkheads for the Green Marina should meet and exceed all client-based needs. The clients should overview the design and speak to the team about any flaws within the layout or setup. All discrepancies must be documented as part of the Final Evaluation and eliminated.


2. A well-based group of plausible clients (such as different types of fishermen and other boaters) should be given a survey in which they give feedback on the layout and design of the Green Marina’s docks and its bulkhead.


3. Following approval from all cliental, a Zoning Permit Application must be completed and submitted to Sandy Hook park officials.


     a. The Zoning Permit Application must be complete and signed.
     b. Survey(s) must be submitted.
     c. All building plans must be submitted.


4. Following approval of the Zoning Permit Application, a Building Permit Application must be obtained through Sandy Hook park officials. If the Zoning Permit Application is denied, discrepancies must be documented as part of the Final Evaluation and eliminated.


Testing Procedures: Final Design

Design Expectations: The design of the Green Marina should satisfy all possible clients and customers in every element. The design should be overall aesthetically pleasing and environmentally friendly. The Marina layout should follow all specifications and avoid all limitations. The Green Marina design should allow for a large number of boats to travel to and from its docks, and provide a suitable fueling station for boats of many different sizes. Environmental concerns, such as storm water management and alternate energy, should be clearly addressed. Most of all, the Marina should be safe and follow all building and zoning requirements provided by Sandy Hook officials.




Testing procedures are as follows:


1. Review all plans with the client. The design of the Green Marina should meet and exceed all client-based needs. The clients should overview the design and speak to the team about any flaws within the layout or setup. All discrepancies must be documented as part of the Final Evaluation and eliminated. Areas of assessment include the following:


     a. Storm Water Management

     b. Fueling Station Management/Fueling Dock

     c. Landscape

     d. Alternate Energy

     e. Docks and Bulkhead Design/Ramp Design

     f. Marina Protection


2. A well-based group of plausible clients (such as different types of fishermen and other boaters) should be given a survey in which they give feedback on the layout and design of the Green Marina.


3. Following approval from all cliental, a Zoning Permit Application must be completed and submitted to Sandy Hook park officials.


     a. The Zoning Permit Application must be complete and signed.

     b. Survey(s) must be submitted.

     c. All building plans must be submitted.


4. Following approval of the Zoning Permit Application, a Building Permit Application must be obtained through Sandy Hook park officials. If the Zoning Permit Application is denied, discrepancies must be documented as part of the Final Evaluation and eliminated.