Today I was able to complete my second drawing for the bulkhead system. The above drawing now indicates the new tie-rod anchor system and other bracing (middle rebar.). I have yet to fully work out fill requirements for Ann Marie, but plans have been made to begin this assessment on Monday, January 10, 2010.
1.07.2011
Log Eleven: 1/07/11
Today I was able to complete my second drawing for the bulkhead system. The above drawing now indicates the new tie-rod anchor system and other bracing (middle rebar.). I have yet to fully work out fill requirements for Ann Marie, but plans have been made to begin this assessment on Monday, January 10, 2010.
Quick Views:
MP 2 Progress Logs
1.04.2011
Log Ten: 1/04/11
Today, after settling in after break, I continued to alter my bulkhead drawings. The new picture is as shown:
The new drawing includes the new tie rod and anchor system which will help keep the structure in place. I will begin more detailed work with Ann Marie and Christine to figure out the height of my bulkhead from ground level, how much fill will be needed, etc. hopefully within the next couple of weeks.
The new drawing includes the new tie rod and anchor system which will help keep the structure in place. I will begin more detailed work with Ann Marie and Christine to figure out the height of my bulkhead from ground level, how much fill will be needed, etc. hopefully within the next couple of weeks.
Quick Views:
MP 2 Progress Logs
Subscribe to:
Posts (Atom)

