MRoy: GM- Dock and Bulkhead
2.03.2011
Log 2: 2/03/11
I began working on my FPU outline and exhibit poster, to the best of my ability.
I am also waiting on Ann Marie and Christine to finalize the height of the bulkhead.
2.01.2011
Log 1: 02/01/11
Today I finalized my drawings to the best of my ability. I also took a look at my original testing procedures to see if they would be adequate for the testing to come. I plan on remodeling them by the end of the week.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)