10.04.2010

Rationale: Bulkhead

Final Solution: Bulkhead
 
 
The bulkhead is a vital part to how the Green Marina will retain its structure. The bulkhead must protect the coastline from erosion, as well as reinforce the land by retaining it. Therefore, there are pressures that must be adequately met. There are multiple materials that can be included in alternate solutions, such as wood, concrete, steel, vinyl, and natural rock. Rock and wood are the least durable of the materials, and so were discarded. For the final solution, a recycled concrete alternative will be used for the bulkhead because it is very low maintenance, high durability, and has the same strength as regular concrete.
 

The dimensions for the bulkhead are as follows: a minimum of 4' above the land, and a minumum of 4' below land (a total of 8' in height). The width will be at least 2', maybe more after more research and calculations are conducted. These dimensions should strengthen the durability and strength of the material v. the land that will be retained by it. Since the other bulkheads that have been placed on the site have failed, extra-strength protection could ensure a longevity of use of materials as well.

As in the figure above, the bulkhead will have a top strip above the major wall portion. This will be slightly thicker than the wall itself (6"-1' thicker) and will take the role of extra protection and support, since often the most vulnerable spot of a landscape is the looser top soil. In addition, there are thicker "arch" layers that are inbetween pilings, which will be hooked onto the bulkhead (pilings will be made of concrete as well for cohesion). This additional layer will allow for increased strength throughout the structure.

Rationale: Dock

 Final Solution: Docks

     In the Dock Rationale, there is a mixture of dock types and materials from the previous solutions. The floating docks will have the floats underneath with durable foam encased in heavy-duty plastic, and the stationary docks will have enough pilings to remain stable in uncertain weather conditions. Both the stationary and the floating docks will be made out of a compressed plastic material, known as plastic recycled timber. This material is very common at green marina sites, and is an eco-friendly alternative to concrete or regular wood. This material "beat out" the others, so to speak, because of how environmentally sound it is; ALL of the plastic will be environmentally friendly, and any concrete used will be lightweight and a recycled alternative to the standard concrete. This concrete will match the concrete found in the ramp/bulkhead area.

              Dimensions will vary according to the specific load that each dock will have, but generally each dock will be 400' in length and 10' in width. Becuase there are no available set 10' wide floats available, two will have to be paired next to eachother, or custom floats will be made. The largest drum float available is 4' X 8' X 32", and supports 4,600 lbs. Proper calculations will be done to determine how many floats will be needed, but there could be as much as 40 per dock if a larger size cannot be determined.

            


 Pilings will also be spaced accordingly. One idea of how the dock will be set up is that each berthing area will have a piling on each side to act as a sort of bumper, and they will allow the vessels to tie up to the pilings safely and efficiently. This means that approximately 300 to 400 pilings will need to be available based on how many spaces the head engineer requires. These pilings will be made out of a lightweight concrete alternative material. Please see CC's final solution for specific dock positions and slip numbers.

          There are two ways to calculate how much float will be required for a dock. One way is to use a calculation that is very complex and exact; the other is to obtain known requirements to derive the proper values. According to many float distributors, a good "rule of thumb" is to have a minumun of 30lbs of bouyancy per square foot of dock surface for small docks, and 38lbs of bouyancy for larger dock areas. Because these numbers are only a basis and not an exact calculation, they will probably be increased and/or altered according to what calculations must be done.