The bulkhead is a vital part to how the Green Marina will retain its structure. The bulkhead must protect the coastline from erosion, as well as reinforce the land by retaining it. Therefore, there are pressures that must be adequately met. There are multiple materials that can be included in alternate solutions, such as wood, concrete, steel, vinyl, and natural rock. Rock and wood are the least durable of the materials, and so were discarded. For the final solution, a recycled concrete alternative will be used for the bulkhead because it is very low maintenance, high durability, and has the same strength as regular concrete.
The dimensions for the bulkhead are as follows: a minimum of 4' above the land, and a minumum of 4' below land (a total of 8' in height). The width will be at least 2', maybe more after more research and calculations are conducted. These dimensions should strengthen the durability and strength of the material v. the land that will be retained by it. Since the other bulkheads that have been placed on the site have failed, extra-strength protection could ensure a longevity of use of materials as well.
As in the figure above, the bulkhead will have a top strip above the major wall portion. This will be slightly thicker than the wall itself (6"-1' thicker) and will take the role of extra protection and support, since often the most vulnerable spot of a landscape is the looser top soil. In addition, there are thicker "arch" layers that are inbetween pilings, which will be hooked onto the bulkhead (pilings will be made of concrete as well for cohesion). This additional layer will allow for increased strength throughout the structure.