Current existing pier.

Specifications:
  • The design must:
    • Location
      • Be within specified perimeters in the Chapel water area off of Sandy Hook coast
    • Environment for Use
      • Be able to withstand rain, wave currents, and other natural weather patterns
      • Retain stability for all four seasons (Summer, Fall, Winter, Spring)
    • Condition of Solution
      • Be spatially scaled
      • Reuse/Recycle existing piers and/or failed bulkheads
      • Be made with environmental products/eco-friendly materials or ideas (docks)
      • Retain land/soil and protect against erosion (bulkhead)
      • Be constructed out of eco-friendly products and ideas (bulkhead)
      • Follow all building/zoning requirements
      • Be economically efficient
    • User/Consumer
      • Be safe for all boats and people, with proper piling and anchoring requirements
      • Allow for various sizes of boats to tether safely to the docks