Log 23: 4/05/11

Logs were due yesterday along with a calendar and participation. The marking period is ending, and I am still struggling to complete my second model. However, I am making some headway with the structure and plan to have both models brought in by the end of the week at latest.

My dock model is completed on my end, but lights need to be attached and tested. My bulkhead model is too top heavy, and does not want to stay together. I need to find a way to secure it in the "ground," which will most likely be a plastic box or something of the like, while still being able to show off the structure. If possible, I would also like to attach the dock model to the bulkhead model, but do not expect to be able to since I am having so much trouble.

4.04.2011

Log 22: 4/4/11

Logs are due today! So I thought I'd post something. We finished up FPUs today with RVD, and I spoke to Mr. Cuttrell and Ms. Green about what to do about my models. They will both be complete and brought in BY Friday, hopefully before.

Otherwise, Happy end of marking period 3, and hello marking period 4! [:

3.31.2011

Log 21: 3/31/11

I was not in class yesterday, so I ended up handing it in today! I was the only one though... so... yep.

I'm really not smart. My stupid model isn't working (not the first one, the second one...) and I keep on forgetting to bring in the other one. BUT! Otherwise I'm donedonedone with my senior project, which rocks.

Won't be here tomorrow, so happy Weekend!

3.29.2011

Log 20: 3/29/11

So I handed in my testing procedures, thankfully my mentors got back to me!

FPUs also started today. No one was really prepared, so I ended up being one of the first ones. No biggie though, I knew what I was talking about. [:


MODEL. MODEL MODEL MODEL. I'm really sorry, I really need to bring it in. It really would have helped my grade for my FPU...

Self Design/Evaluation due tomorrow!

3.28.2011

Formal Progress Update 3: 3/29/11


FPU3: Problem Background

A failed bulkhead from the site.


FPU3: Design Brief


Design and create a model for the docks and bulkhead of a “Green Marina” that will allow commercial, recreational, and research boats to dock safely. The marina is to be designed on a sectioned off piece of Sandy Hook’s western coast (above).

FPU3: Individual Specifications

Current existing pier.

Specifications:
  • The design must:
    • Location
      • Be within specified perimeters in the Chapel water area off of Sandy Hook coast
    • Environment for Use
      • Be able to withstand rain, wave currents, and other natural weather patterns
      • Retain stability for all four seasons (Summer, Fall, Winter, Spring)
    • Condition of Solution
      • Be spatially scaled
      • Reuse/Recycle existing piers and/or failed bulkheads
      • Be made with environmental products/eco-friendly materials or ideas (docks)
      • Retain land/soil and protect against erosion (bulkhead)
      • Be constructed out of eco-friendly products and ideas (bulkhead)
      • Follow all building/zoning requirements
      • Be economically efficient
    • User/Consumer
      • Be safe for all boats and people, with proper piling and anchoring requirements
      • Allow for various sizes of boats to tether safely to the docks

FPU3: Individual Limitations

View of the failed timber bulkhead at high tide.

Limitations:
  • Size Restrictions
    • The design must not alter from laws or codes regarding placing, length, or construction of docks and bulkheads
    • Must meet regulations
  • Material Restrictions
    •  Environmentally friendly, yet efficient
    • Cement, Vinyl, Recycled wood (types of wood, patterns,etc)
  • Other Restrictions
    • Bulkheads cannot severely alter ocean patterns in a negative way

FPU3: Testing Procedures and Results

Final solutions of the bulkhead and dock systems. 
I. Testing procedures
1.     Review all plans with the Green Marina team. The design of the docks and bulkheads for the Green Marina should meet and exceed all client-based needs. All clients and mentors should overview the design and speak to the team about any flaws within the layout or setup. All discrepancies must be documented as part of the Final Evaluation and be eliminated.
2.     A well-based group of plausible clients (mentors, field specialists) should be given a survey in which they give feedback on the structural design and environmental aspect of the Green Marina’s dock and bulkhead systems. This is the primary stage of testing.
3.     After the surveys have been taken by the mentors and assessed, any major discrepancies will be eliminated or fixed.
4.     Further assessment will be done and documented as part of the Final Solution.

FPU3: Conclusion



Questions?

3.25.2011

Log 19: 3/25/11

It's around 2:00 pm in Systems class. I've been talking to Ms. Green, and she said it was alright that I didn't have testing, especially since no one else did. None of us think ahead! So... hopefully I will have that soon, because the marking period ends on April 4th or 5th or something, which is a little over a week.

I'm also stupid, and didn't bring in my model. Should be happening early next week.

3.23.2011

Log 18: 3/23/11

So, about testing... none of my mentors have gotten back. However, there are certain parts of my testing results that I can work on, such as the description of the final solution, who is involved in testing, and how exactly I am testing.

My model is finally coming together! I'll have it in on Monday. I still have to do my other one though. Hopefully it will work better than the first.

3.22.2011

Log 17: 3/22/11

Final Solution was due yesterday. Unfortunately, my model is not working with me. I will try to complete it ASAP, and will then complete my bulkhead model.

Mentor Contacts are also due today, and I handed them in to Ms. Green a little while after class, since I stayed late for play practice... [:

Still nothing for testing. ]: Oh dear.

3.18.2011

Log 16: 3/18/11

Seriously! I can't believe my stupid model -- it still will not work, even when I switched materials. Something is going to have to change, I just don't know what. I'll update when I make some progress.

Testing is due in a week, but no word from my mentors. Hopefully I will get an update on that as well!

3.15.2011

Log 15: 3/15/11

I am trying to complete my model, but am having an extremely hard time. Every time I attempt to to glue the cross braces together, or even to the frame, they break or warp. Its kind of really terrible. I'm trying to find a new material (preferably some sort of wood or plastic) to replace the styrofoam.

Also! I sent out my surveys and information packets to my mentors over email. They will hopefully fax it back soon! I also finalized my exhibit poster and my FPU outline. So just model, testing, and self evaluation to go. [: So close!

3.11.2011

Log 14: 3/11/11

Visited Hobbymasters with Anna Bennett on Wednesday! Went very well, I was able to speak with a store employee who helped aid me in my material choices. He suggested styrofoam for most pieces, along with some plastic or wood pieces. Very helpful. [:

3.09.2011

Log 13: 3/09/11

I have finished painting my model pieces (well, what I have anyway...) and plan to start putting it together very soon. However, Ms. Green recently told me that I need TWO models (one for bulkhead, one for the dock), so I am planning on going to Hobbymasters after school today with Anna.

3.06.2011

Log 12: 3/06/11

Although it's a Sunday, I thought I'd update.

I began work on my FS Info for my mentors. It's mainly a composition of my finished solution renderings, material schedules, and information about the types of materials being used. This should be completed by the end of the week, and then each mentor (John Wanninger, Katherine Mobley, Mr. Danko, Bill Bates) will be asked to take the survey.

3.04.2011

Log 11: 3/04/11

Started my model! However, I am missing piling and decking materials... I'll probably ask Mr. Cuttrell to help me out?

I also still have a lot to do. I plan on working on my Final Solution packet for my mentors this weekend.