In Alternate Solution #3, there is a mixture of dock types and materials from the previous solutions. The floating docks must still have the floats underneath with durable foam encased in heavy-duty plastic, and the stationary docks must have enough pilings to remain stable in uncertain weather conditions. However, the materials are basically up for assessment, since there are at least four different materials available for use. These materials include steel, concrete, vinyl, and wood. Because wood, though one of the earliest materials used, is unreliable in the sense that it constantly needs to be protected with laquer, and needs continual maintenance in case of water damage as well as sea life inhabitation. Steel is similar, since it constantly needs reapplication of protective layers to prevent rust. Therefore, the best choices would be between concrete and vinyl. Both materials are low maintenance and last for a long time. Vinyl is more lightweight than concrete, and can last as long as 50 years. However, vinyl may not be best suitable for a green marina material, and further research is being developed about its environmental nature. Concrete lasts up to 30 years and is often much heavier than other materials, but it holds up very well against weather and water patterns. The floating dockscould also be made out of a compressed plastic material, known as plastic recycled timber. This material is very common at green marina sites.
Dimensions will vary according to the specific load that each dock will have, but generally each dock will be 400' in length and 10' in width. Becuase there are no available set 10' wide floats available, two will have to be paired next to eachother, or custom floats will be made. The largest drum float available is 4' X 8' X 32", and supports 4,600 lbs. Proper calculations will be done to determine how many floats will be needed, but there could be as much as 40 per dock if a larger size cannot be determined.
Pilings will also be spaced accordingly. One idea of how the dock will be set up is that each berthing area will have a piling on each side to act as a sort of bumper, and they will allow the vessels to tie up to the pilings safely and efficiently. This means that approximately 300 to 400 pilings will need to be available based on how many spaces the head engineer requires. These pilings can also be made out of a variety of materials, but will most likely be made out of concrete or vinyl.
There are two ways to calculate how much float will be required for a dock. One way is to use a calculation that is very complex and exact; the other is to obtain known requirements to derive the proper values. According to many float distributors, a good "rule of thumb" is to have a minumun of 30lbs of bouyancy per square foot of dock surface for small docks, and 38lbs of bouyancy for larger dock areas. Because these numbers are only a basis and not an exact calculation, they will probably be increased and/or altered according to what calculations must be done.
No comments:
Post a Comment