3.28.2011

FPU3: Testing Procedures and Results

Final solutions of the bulkhead and dock systems. 
I. Testing procedures
1.     Review all plans with the Green Marina team. The design of the docks and bulkheads for the Green Marina should meet and exceed all client-based needs. All clients and mentors should overview the design and speak to the team about any flaws within the layout or setup. All discrepancies must be documented as part of the Final Evaluation and be eliminated.
2.     A well-based group of plausible clients (mentors, field specialists) should be given a survey in which they give feedback on the structural design and environmental aspect of the Green Marina’s dock and bulkhead systems. This is the primary stage of testing.
3.     After the surveys have been taken by the mentors and assessed, any major discrepancies will be eliminated or fixed.
4.     Further assessment will be done and documented as part of the Final Solution.