The original drawings for the bulkhead and dock are located above. These drawings are hand-drawn and to scale, with all of the basic concepts of the final construction plan.
After beginning work in CAD, the dock renderings became finalized almost immediately. The main concern was with the bulkhead, which needed to be reinforced due to possible waves and years of use. Therefore, the bulkhead became thicker (2 ft) and pilings were included (1 foot).
After the 2D drawings were roughly sketched out, 3D drawings became a work in progress. Currently, the above drawings are of the dock (first figure) and the bulkhead's three-dimensional frame.
After thorough research, mathematics, and evaluation, the bulkhead has changed to the images above. The changes include an installation of a tie rod and anchor system and a panel of composite material. The aesthetic arcs between pilings were also removed due to lack of necessity and difficulty in creation.