Yesterday, I was able to complete my 3D isometric view for my bulkhead. I still have a bit of tweaking to do, but otherwise my drawings should be ready for evaluation. Because the design of the layout for the docks has been altered since my materials lists were compiled, I will need to update both lists. This should be done by Wednesday of next week, assuming that I can use a copy of the plans to do my calculations. I am currently working on my press release assignment, which is to be completed by December 21st for evaluation.